Skip to content

Tanshanomi’s Bikes

  • Home
  • Bultakenstein 2.0
  • The Bride
  • Diesel Cruiser
  • Benelli 250R
  • All Projects

Month: November 2012

Swingarm primed
Posted in
  • Bultakenstein - Original [Aborted]

Swingarm primed

November 25, 2012January 1, 2025

I’m putting this project to bed for a while. Christmas presents and holiday parties will drain the finances a bit over the next month or two, and then I am going to … Swingarm primedRead more

Swingarm spacer
Posted in
  • Bultakenstein - Original [Aborted]

Swingarm spacer

November 9, 2012January 1, 2025

This morning I made my swingarm shaft spacer. Starting with 7/8″ OD .156 DOM, I cut it to length with a hacksaw, filed the ends a bit to ensure that the faces … Swingarm spacerRead more

A (Minor) Milestone
Posted in
  • Bultakenstein - Original [Aborted]

A (Minor) Milestone

November 8, 2012January 1, 2025

A tiny milestone reached: I actually bolted the swingarm to the frame this morning. Here it is from the outside… …and inside. The holes in the frame plate are tapped. I may … A (Minor) MilestoneRead more

Escutcheon fabrication
Posted in
  • Bultakenstein - Original [Aborted]

Escutcheon fabrication

November 2, 2012January 1, 2025

I’m working on the escutcheon plate that will decrease the diameter of the left frame hole for the swingarm shaft. Not finished yet, but this in-progress fit-up gives you an idea what … Escutcheon fabricationRead more

Looking for the old SNAP JUDGMENTS site? CLICK HERE!

Trademarked names are used for descriptive purposes only.

Copyright © 2011-2025 Tanshanomi.com and owners thereof.
Powered by WordPress and HybridMag.
  • Home
  • Bultakenstein 2.0
  • The Bride
  • Diesel Cruiser
  • Benelli 250R
  • All Projects